Demand Response

WELCOME TO EVEN MORE SAVINGS

How does Demand Response pay?

The electric grid has limited generation capacity, and runs with a set amount of headroom. Some days however are too taxing on the grid. In addition to the normal demand on the system, a heat wave has everyone turning up the AC. This demands more electricity–potentially beyond the system’s capacity, at which point brown-outs and rolling black-outs occur.

To avoid this scenario, a system of incentives exists. This chart illustrates an “Event Day.” When called, the participants voluntarily shift their demand to an alternate time-frame. Here a medium-sized manufacturer shifts some demand to the evening and is awarded more than $6,000.

VIEW OUR FULL PRESENTATION ON DEMAND RESPONSE

WE OFFER ZERO-PENALTY DEMAND RESPONSE

Some or even most demand response programs offer the ability to earn money for participation, but will penalize you if you are unable to perform during an emergency event.  Not us.  Contact us for a completely free consultation to find out how you may be able to participate.

SMART GRID PROGRAMS

Emergency Demand Response

Demand Reduction (DR, ILR) – Limited, Extended, and Annual

Energy Reduction (Voluntary Participation)

Load Reduction

Synchronized Reserves

Day Ahead Scheduling Reserves

Regulation and Frequency Response

CON EDISON SMART GRID PROGRAM IN THE SPOTLIGHT

DLRP Tier 1 Offer

$18/kW

5+ event bonus pay: $5/kW

Performance Pay Rate: $1.00/kWh

2-Hour Test Each SCP (2)

Notification: 2 Hours

Duration: May 1 – Sep 30

EXAMPLE 4-HOUR EVENT (1)

Reservation Pay: 50kW x 4h x $18 = $3,600

Performance Pay: 50kW x 4h x $1/kWh = $200

Total Payout: $3,800

Settlements paid seasonally

CSRP 4-Boro Offer

$18/kW

5+ event bonus pay: $5/kW

Performance Pay Rate: $1.00/kWh

1-Hour Test Each SCP (2)

Notification: 21 Hours

Duration: May 1 – Sep 30

EXAMPLE 4-HOUR EVENT (1)

Reservation Pay: 50kW x 4h x $18 = $3,600

Performance Pay: 50kW x 4h x $1/kWh = $200

Total Payout: $3,800

Settlements paid seasonally

ASSUMPTIONS FOR DLRP/CSRP TABLE ABOVE

50 kW Commitment
Event Length of 4 hours
Tier 1 DLRP Pay/CSRP Pay
Additional 3-Year incentive available but not shown

CSRP reservation payments of $18/kW for Bronx, Brooklyn, Manhattan, and Queens
CSRP also available for Staten Island and Westchester at a reduced rate of $6/kW

NOTES

SCP – Seasonal Capability Period

REQUIREMENTS & PENALTIES

There are no penalties for non-performance
Non-performance results in de-rating
Performance of 25% or less results in no payment
Customer must have a 15-min ConEd interval meter or AMI Smart Meter

OTHER

CSRP hours vary based on geography
DLRP Tier 2 program for $25/kW