SMART GRID

Home / SMART GRID

WELCOME TO EVEN MORE SAVINGS

How does Demand Response pay?

The electric grid has limited generation capacity, and runs with a set amount of headroom. Some days however are too taxing on the grid. In addition to the normal demand on the system, a heat wave has everyone turning up the AC. This demands more electricity–potentially beyond the system’s capacity, at which point brown-outs and rolling black-outs occur.

smart-grid.demand-response

The electric grid has limited generation capacity, and runs with a set amount of headroom. Some days however are too taxing on the grid. In addition to the normal demand on the system, a heat wave has everyone turning up the AC. This demands more electricity–potentially beyond the system’s capacity, at which point brown-outs and rolling black-outs occur.

Smart Grid Programs

Broadleaf will help you find the program that best fits your business model. Participating in a smart grid program not only helps you to capture additional revenue, but also on the day of an event, mitigates the use of high-pollutant generation resources such as coal and oil that would otherwise be burned to meet the demand.

smart-grid.manhattan

CON EDISON SMART GRID PROGRAM IN THE SPOTLIGHT

ConEd DLRP Tier 1 Offer

$18/kW
  • 5+ event bonus pay: $6/kW
  • Performance Pay Rate: $1.00/kWh
  • Number of Test Events: 1
  • Notification: 2 Hours
  • Duration: May 1 – Sep 30
  • Reservation Payout(1): $4,500
  • Performance Payout(1): $200
  • Total Payout(1): $4,700

Other Incentives

BONUS
  • Enablement Pay Rate: $800/kW
  • Enablement Pay Rate: $800/kW
  • Min peak-load reduction of 50 kW
  • Funds for Backup Generation
  • Funds for Alternative Curtailment
  • Incentive cap at 50% of project
  • Incentive cap at 50% of project
  • CALL TO LEARN MORE

ConEd CSRP 4-Boro Offer

$18/kW
  • 5+ event bonus pay: $6/kW
  • Performance Pay Rate: $1.00/kWh
  • Number of Test Events: 1
  • Notification: 21 Hours
  • Duration: May 1 – Sep 30
  • Reservation Payout(1): $4,500
  • Performance Payout(1): $200
  • Total Payout(1): $4,700

(1) ASSUMPTIONS FOR DLRP/CSRP TABLE ABOVE:

  • 200 kW Commitment
  • Event Length of 4 hours
  • Tier 1 DLRP (Tier 2 pay is higher but limited availability)
  • Additional 3-Year incentive available but not shown
  • 1 Total DLRP/CSRP Test Event, 2 Total CSRP Events