SMART GRID
WELCOME TO EVEN MORE SAVINGS
How does Demand Response pay?
The electric grid has limited generation capacity, and runs with a set amount of headroom. Some days however are too taxing on the grid. In addition to the normal demand on the system, a heat wave has everyone turning up the AC. This demands more electricity–potentially beyond the system’s capacity, at which point brown-outs and rolling black-outs occur.

Smart Grid Programs
Broadleaf will help you find the program that best fits your business model. Participating in a smart grid program not only helps you to capture additional revenue, but also on the day of an event, mitigates the use of high-pollutant generation resources such as coal and oil that would otherwise be burned to meet the demand.

CON EDISON SMART GRID PROGRAM IN THE SPOTLIGHT
ConEd DLRP Tier 1 Offer
- 5+ event bonus pay: $5/kW
- Performance Pay Rate: $1.00/kWh
- 2-Hour Test Each SCP (2)
- Notification: 2 Hours
- Duration: May 1 – Sep 30
- - - -
- EXAMPLE 4-HOUR EVENT (1)
- Reservation Pay: 50kW x 4h x $18 = $3,600
- Performance Pay: 50kW x 4h x $1/kWh = $200
- Total Payout: $3,800
- Settlements paid seasonally
ConEd CSRP 4-Boro Offer
- 5+ event bonus pay: $5/kW
- Performance Pay Rate: $1.00/kWh
- 1-Hour Test Each SCP (2)
- Notification: 21 Hours
- Duration: May 1 – Sep 30
- - - -
- EXAMPLE 4-HOUR EVENT (1)
- Reservation Pay: 50kW x 4h x $18 = $3,600
- Performance Pay: 50kW x 4h x $1/kWh = $200
- Total Payout: $3,800
- Settlements paid seasonally
(1) EXAMPLE CRITERIA
- 50 kW Commitment
- Event Length of 4 hours
- Tier 1 DLRP Pay/CSRP Pay
- CSRP reservation payments of $18/kW for Bronx, Brooklyn, Manhattan, and Queens
- CSRP also available for Staten Island and Westchester at a reduced rate of $6/kW
(2) NOTES
- SCP - Seasonal Capability Period
(3) REQUIREMENTS & PENALTIES
- There are no penalties for non-performance
- Non-performance results in de-rating
- Performance of 25% or less results in no payment
- Customer must have a 15-min ConEd interval meter or AMI Smart Meter
(4) OTHER
- CSRP hours vary based on geography
- DLRP Tier 2 program for $25/kW